Truck Load-out Terminal Upgrade
ZAP was responsible for the mechanical, civil, structural and electrical design for the upgrade of a terminal in Henderson, Colorado. The project was the conversion of the existing rail unloading system from a pneumatic system to a mechanically conveyed system for the distribution of fly ash to existing storage domes.

