North Dakota Crude Stabilizer and Trucking Terminal Engineering and Procurement
ZAP performed front end engineering and cost estimation before completing the detailed engineering, procurement and construction planning for a 40,000 BPD crude stabilization facility with functionality to load, unload and meter crude and facility slop oil via two truck loading lanes equipped with fully automated driver-loading capabilities. The facility was designed to operate in winter months and the design included engineering provisions against snow drifting and to ensure operation down to a minimum ambient temperature of -38°F.