70 MMSCFD Compressor Station EPC
ZAP was selected to assist with the engineering design, procurement, and construction of a greenfield compressor station in New Mexico.
ZAP has executed over 1,000 midstream projects in oil and gas and heavy industrial facilities since 2001. Ensuring the success of your project is our primary objective.
ZAP was selected to assist with the engineering design, procurement, and construction of a greenfield compressor station in New Mexico.
ZAP was selected to assist with the engineering, design, procurement, and construction of a greenfield compressor station in New Mexico.
ZAP was contracted by the cryogenic plant equipment packager to engineer and design the installation of a greenfield cryogenic gas plant in the Permian Basin.
An NGL Pipeline increased operating pressure to 1,440 psig and a client contracted ZAP to install new boost pumps to boost both Cryo plant 1 and plant 2 into the existing pipeline.
ZAP completed the EPC expansion of a New Mexico compressor station from 42MMSFD to 70MMSCFD and increased the discharge pressure from 700psig to 1250psig.
This Greenfield compressor station in Lea County, NM receives rich natural gas from an existing gathering system at 40-60 psig and compress it to 1,050-1,300 using Six (6) leased compressor skids driven by Caterpillar G3608 A4 gas engines and dehydrated to 7 lbs/MMSCF.
ZAP completed the engineering, procurement, and construction to convert an existing gas processing plant to a compressor station with inlet liquid separation, amine treating, dehydration and water separation, and disposal.
ZAP completed the FEED study, engineering design, procurement management, and construction management of a 40,000 bbl/day oil stabilization facility in North Dakota.
ZAP completed the engineering design, procurement, and construction of the installation of two Solar Taurus 70 turbine booster compressors site, with a future option to install a third Solar Taurus 70 turbine booster compressor.
ZAP completed the engineering design, procurement, and construction of the installation of two Solar Taurus 70 turbine booster compressors, with a future option to install a third Solar Taurus 70 turbine booster compressor.
Each ROTF will consist of modular 30,000 BPD oil stabilization trains and a balance of plant infrastructure suitable for a full plant capacity of 120,000 BPD.
ZAP was retained in an engineering design, procurement, and construction (EPC) role for the installation of a greenfield compressor station in Weld County, Colorado.
60 MMSCFD Libby Gas Plant – Lea County, New Mexico ZAP Engineering & Construction Services, INC was contracted, by 3 Bear Energy LLC, to perform the engineering and design for a 60 MMSCFD cryogenic gas processing plant with 400 GPM amine unit, inlet liquids handling, stabilizer, and all utilities. The project included site development, in […]
EPC- 60 MMSCFD Cryo Gas Plant- Weld County, CO ZAP is contracted as the EPC contractor for the design, balance of plant procurement, and construction of a 60 MMSCFD Cryo Gas Plant in Weld County, CO. ZAP completed a preliminary construction estimate level engineering and design in order to define the project scope, schedule, […]
Excellence in Execution
ZAP is excited to announce the launch our expansion into the Eastern US with the addition of our East Coast Engineering office in Bethlehem, PA!
ZAP is excited to announce the launch our expansion into Houston, TX! We are thrilled to welcome Chris Combs who will assume the role of Vice President – Gulf Coast Engineering!