Engineering &
Construction Services, Inc.

EPC-Simultaneous 210 MMSCFD Turbine Stations- Site 1

EPC – 210 MMSCFD Weld County Turbine Station

ZAP completed the engineering design, procurement, and construction of the installation of two Solar Taurus 70 turbine booster compressors site, with a future option to install a third Solar Taurus 70 turbine booster compressor. The compressor station is designed to flow 210 MMSCFD and includes dehydration and condensate handling. The station design reduced its emissions utilizing new low nitrogen oxides (NOx) turbines which produce less than 12 ppm, achieving a new client standard in Colorado. This compressor station was also designed to be operated remotely or locally. This is the third generation of the ZAP standard compressor station design improving value for our clients by allowing for reduced costs.

Meet the Team. (720) 529-4430

Call or send us your scope and we’ll assemble the team of experts who will help you successfully execute your project.

Schedule a meeting

ZAP ECS Logo

Excellence in Execution

Latest news and updates from around the company.

See All News