Engineering &
Construction Services, Inc.

Fly Ash Terminal

Fly Ash Terminal – Greenfield

ZAP Engineering & Construction Services, Inc. designed a greenfield fly ash terminal on an existing rail line. A new spur added for a new rail unloading pit. Fly ash unloaded at the rail pit was pneumatically conveyed from 2 convey pods to 1 of 3 storage structures. A single truck unloading station was added to pneumatically convey silos.  

In a flat storage building, fly ash was moved via a front end loader and dumped into a drive-over hopper. Fly ash was fed from the underground hopper to a bucket elevator via air-slide and distributed to silos. Both silos had aerated bin bottoms. Fly ash discharged from the silos was metered and blended. The metering was done by in-line flow meters. Blended ash was then fed via air-slide to the truck loading spout.

dfw render

Meet the Team. (720) 529-4430

Call or send us your scope and we’ll assemble the team of experts who will help you successfully execute your project.

Schedule a meeting

ZAP ECS Logo

Excellence in Execution

Latest news and updates from around the company.

See All News