A brownfield replacement of an existing facility consisting of inlet turbine compression, amine treating, TEG dehydration, refrigerated cryogenic turboexpander process, residue compression and turbine power generation.
- 125 mmscfd Expansion
- Turbine Driven Inlet Compression
- Gas Engine Driven Compression
- Amine treating
- TEG Dehydration
- Cryogenic Turbo Expander
- Electric Power Generation (Turbines)